(ARC) is pleased to present the following
pre-packaged budgetary splash pad design
concepts in order to assist in project planning
and aligning budgetary expectations in
relationship to splash pad area, feature flow
rate and product selections. The packages are
budgetary estimates based on
average U.S. costs for construction, products
and services.
The enclosed budgetary costs include:
-
Splash pad construction drawing provided by
ARC
-
Complete product package as supplied by ARC
including all water play components and
prefabricated operating systems. Operating
systems are all on/off systems with one
Activation Bollard.
-
Earthwork needed for splash pad construction
& mechanical system installation.
-
Installation of complete mechanical system
-
Installation of non-slip broom finished
concrete pad
-
Installation of water play components
-
System startup service, operation training
and manuals
These budgets do not include:
-
Costs for local or state permitting
-
Any soil corrections, rock excavation,
removal of trees, or dewatering
-
Splash pad area is brought to rough grade
prior to construction
-
Required utilities to be brought to splash
pad area by others. (water, waste, power)
-
Landscape design and services such as
fencing, turf, plantings, and additional
concrete decking or pathways.
-
Equipment building to house mechanical
systems and bath/shower facilities as
required by local health departments.
Please contact ARC or your local representative
for a more detailed and project specific free
design concept and budgetary analysis. |